Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Leek · ST13 · Staffordshire

Conservation rooflight installation in Leek

Conservation rooflight installation in Leek comes down to what happens around the glass. A good unit sat on a poor upstand, or with the membrane or flashing cut short at the corners, will still let water in. We fit each conservation rooflight to the maker's instructions for fixings, packers and sealant, for homes and businesses across Leek and the rest of Staffordshire. That covers supply and fit, fit-only for a unit you already own, and swapping out a tired one. Every job starts with a written quote, so the price and scope are clear before anyone climbs a ladder.

Guide price from £1,145 · Supply & fit

Guide prices

Small conservation unit

£1,145 – £1,695including VAT at 20%

Low-profile unit with glazing bar, slate or tile flashing

Medium unit

£1,695 – £2,495including VAT at 20%

Larger opening, lead or matching flashings

Large or bespoke

£2,495 – £3,845including VAT at 20%

Larger or made-to-order units for listed or sensitive roofs

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Our fitters come to you. For Leek that covers ST13, ST9 and ST8, plus nearby Biddulph and Congleton. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.

Fit-only or supply and fit

Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.

Included in the work

  • Slates or tiles made good around the frame with tidy cuts
  • Flashings in lead or a matching kit, dressed to the covering
  • Rafters trimmed with timbers that suit the existing roof
  • Glazing bar and frame detail — We check whether the council has asked for particular details, such as a central glazing bar or a dark frame colour.
  • Conservation area rules by nation — We check the permitted development position for your nation before the rooflight is ordered.

How a fitting day runs

On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a conservation rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.

Do you need permission in Leek?

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

Getting a price from photos

Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in ST13, and we can price it.

Common questions in Leek

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

How long does fitting take?

Fitting a conservation rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

What if my roof opening is the wrong size for the conservation rooflight?

We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

Planning a conservation rooflight in Leek? Tell us about the roof and we will come back with a clear price in writing.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Conservation rooflights in Leek

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote