Guide prices
Small conservation unit
Low-profile unit with glazing bar, slate or tile flashing
Medium unit
Larger opening, lead or matching flashings
Large or bespoke
Larger or made-to-order units for listed or sensitive roofs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Newtown we cover
Fitters travel to the job, so the address is what counts. In Newtown that means postcode districts SY16, SY17 and SY15, and the same teams can just as easily take on work in Welshpool, about 12 miles away, or Llandrindod Wells at roughly 19 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
Your conservation rooflights or ours
Supply and fit tends to suit people who would rather not pick a unit from a catalogue. We look at the roof, the opening and how you use the room, then put a conservation rooflight on the quote that fits all three. Fit-only suits people who already know what they want, or have one on site. We are happy with either. The difference is who stands behind what: on fit-only, the maker or retailer covers the product, and our workmanship guarantee covers the installation.
On the day, we cover
- Slates or tiles lifted carefully and kept for reuse where possible
- Rooflight set low so it sits close to the line of the roof
- Flashings in lead or a matching kit, dressed to the covering
- Energy and old roofs — We make sure the rooflight meets current energy rules while suiting an older roof build-up.
- Glazing bar and frame detail — We check whether the council has asked for particular details, such as a central glazing bar or a dark frame colour.
How a fitting day runs
Where a job takes one day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a conservation rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Planning, building control and Newtown
Wales sets energy limits of 2.2 W/m²K for rooflights and 1.4 W/m²K for roof windows, and new rooflight openings generally need building regulations approval. Replacement units are controlled fittings; we are not registered with a competent person scheme, so ours are covered by a building notice to the council. Planning permission is needed for rooflights in conservation areas, National Parks, AONBs and World Heritage Sites. We check which applies and include the fee in your quote.
What to send for a quick quote
For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as SY16.
Common questions in Newtown
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
How long does fitting take?
Fitting a conservation rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Does a rooflight need building regulations approval?
In Wales a new opening generally needs building regulations approval. A replacement must be self-certified by a scheme-registered installer or covered by a building notice. We are not registered with a scheme, so replacements we fit go through a building notice, and the council's fee is shown on your quote.
Send a few photos and your SY16 postcode, and we will put together a written quote for the job.