Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
York · YO1 · North Yorkshire

Conservation rooflight installation in York

Glass is heavy, and bigger units get heavy fast. Fitting a conservation rooflight in York means planning how it travels from the delivery vehicle to the roof without chipping an edge or straining a back. Smaller units go up by hand with two fitters. Larger ones may need a hoist, a scaffold loading bay or a crane, and we tell you at quote stage if that applies. Once it is up, the fitting follows the maker's sequence: seat, fix, seal, finish. We take on work like this across North Yorkshire.

Guide price from £1,145 · Supply & fit

What the job costs in York

Small conservation unit

£1,145 – £1,695including VAT at 20%

Low-profile unit with glazing bar, slate or tile flashing

Medium unit

£1,695 – £2,495including VAT at 20%

Larger opening, lead or matching flashings

Large or bespoke

£2,495 – £3,845including VAT at 20%

Larger or made-to-order units for listed or sensitive roofs

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Fitting across York and nearby

York and the districts around it, YO1, YO31 and YO10, all sit inside our working area. So does the ground between York and Selby (12 miles), and on towards Kippax (18 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.

Your conservation rooflights or ours

There are two ways to do this. Supply and fit means we source a conservation rooflight that suits your roof and install it, so one company answers for both the product choice and the fitting. Fit-only means you buy the unit and we install it. With fit-only, the product warranty stays with the maker or seller, and our written guarantee covers the fitting work. Both routes get the same checks on the opening, the upstand and the maker's instructions before anything is fixed.

On the day, we cover

  • Slates or tiles made good around the frame with tidy cuts
  • Inside lining fitted to suit the room's ceiling or exposed rafters
  • Position checked against any consent drawings or council conditions
  • Reusing the original covering — We plan to reuse the existing slates or tiles wherever we can.
  • Glazing bar and frame detail — We check whether the council has asked for particular details, such as a central glazing bar or a dark frame colour.

From arrival to clean-up

Where a job takes one day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a conservation rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.

Planning, building control and York

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

Help us quote accurately

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, YO1 or nearby, confirms travel.

Common questions in York

Do you offer trade rates for builders and roofers?

We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

For a free, no-obligation quote in York, use the form or call us with the details of your roof.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Conservation rooflights in York

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote