What the job costs in Hinckley
Small conservation unit
Low-profile unit with glazing bar, slate or tile flashing
Medium unit
Larger opening, lead or matching flashings
Large or bespoke
Larger or made-to-order units for listed or sensitive roofs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Distance is rarely the deciding factor. A roof in Earl Shilton, 4 miles from Hinckley, gets the same survey, the same written quote and the same fitting process as one in LE10, LE9 and CV13. What changes the price is the job itself: size of unit, roof type, access and lifting. Nuneaton, around 4 miles out, is treated the same way.
Buying your own, or letting us supply
If you have bought a conservation rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the flashing kit and the roof pitch range. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.
On the day, we cover
- Slates or tiles lifted carefully and kept for reuse where possible
- Rafters trimmed with timbers that suit the existing roof
- Inside lining fitted to suit the room's ceiling or exposed rafters
- Conservation area rules by nation — We check the permitted development position for your nation before the rooflight is ordered.
- Energy and old roofs — We make sure the rooflight meets current energy rules while suiting an older roof build-up.
How a fitting day runs
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a conservation rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning and building rules in England
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Help us quote accurately
For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as LE10.
Common questions in Hinckley
How long does fitting take?
Fitting a conservation rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Will my new conservation rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
Planning a conservation rooflight in Hinckley? Tell us about the roof and we will come back with a clear price in writing.