Guide prices
Small conservation unit
Low-profile unit with glazing bar, slate or tile flashing
Medium unit
Larger opening, lead or matching flashings
Large or bespoke
Larger or made-to-order units for listed or sensitive roofs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Fitting across Broadstairs and nearby
Our fitters come to you. For Broadstairs that covers CT10, CT11 and CT9, plus nearby Ramsgate and Margate. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
Fit-only or supply and fit
There are two ways to do this. Supply and fit means we source a conservation rooflight that suits your roof and install it, so one company answers for both the product choice and the fitting. Fit-only means you buy the unit and we install it. With fit-only, the product warranty stays with the maker or seller, and our written guarantee covers the fitting work. Both routes get the same checks on the opening, the upstand and the maker's instructions before anything is fixed.
Included in the work
- Flashings in lead or a matching kit, dressed to the covering
- Rooflight set low so it sits close to the line of the roof
- Slates or tiles made good around the frame with tidy cuts
- Glazing bar and frame detail — We check whether the council has asked for particular details, such as a central glazing bar or a dark frame colour.
- Energy and old roofs — We make sure the rooflight meets current energy rules while suiting an older roof build-up.
A typical installation day
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a conservation rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning and building rules in England
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Getting a price from photos
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around CT10 and we will come back with a quote or a survey date.
Common questions in Broadstairs
How long does fitting take?
Fitting a conservation rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Got a unit waiting to go in, or need one sourced? Either way, start with your Broadstairs address and a couple of photos.