Shepherds Bush guide prices
Small conservation unit
Low-profile unit with glazing bar, slate or tile flashing
Medium unit
Larger opening, lead or matching flashings
Large or bespoke
Larger or made-to-order units for listed or sensitive roofs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering W12 and neighbouring districts
Looking at a property near Shepherds Bush but not quite in it? We work across W12, W14 and W11 and outwards to Notting Hill, Hammersmith and Kensington. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Shepherds Bush.
What we check on a supplied unit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a conservation rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the opening size and the flashing kit it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
Included in the work
- Inside lining fitted to suit the room's ceiling or exposed rafters
- Slates or tiles lifted carefully and kept for reuse where possible
- Flashings in lead or a matching kit, dressed to the covering
- Listed building consent — We confirm listed building consent is in place before fitting any rooflight on a listed building.
- Conservation area rules by nation — We check the permitted development position for your nation before the rooflight is ordered.
Fitting your conservation rooflight, step by step
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a conservation rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning, building control and Shepherds Bush
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Details that speed up your quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around W12 and we will come back with a quote or a survey date.
Common questions in Shepherds Bush
What if my roof opening is the wrong size for the conservation rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
How long does fitting take?
Fitting a conservation rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
Questions before you commit? Send them over with your Shepherds Bush postcode and we will answer them plainly, with a quote alongside.