Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Brent · HA0 · Greater London

Conservation rooflight installation in Brent

Our guide price for conservation rooflight installation starts from £1,145, and the real figure for your roof in Brent depends on a handful of things: the size and type of conservation rooflight, whether the opening exists already, the roof covering, and how easy access is. We fix the price in a written quote before work begins. Nothing gets added on the day without your say-so. For a rough idea first, photos and a couple of measurements are enough to go on, and we cover all of Greater London.

Guide price from £1,145 · Supply & fit

What the job costs in Brent

Small conservation unit

£1,145 – £1,695including VAT at 20%

Low-profile unit with glazing bar, slate or tile flashing

Medium unit

£1,695 – £2,495including VAT at 20%

Larger opening, lead or matching flashings

Large or bespoke

£2,495 – £3,845including VAT at 20%

Larger or made-to-order units for listed or sensitive roofs

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Distance is rarely the deciding factor. A roof in Wembley, 1 mile from Brent, gets the same survey, the same written quote and the same fitting process as one in HA0, HA9 and UB6. What changes the price is the job itself: size of unit, roof type, access and lifting. Harrow, around 2 miles out, is treated the same way.

Your conservation rooflights or ours

Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.

On the day, we cover

  • Rooflight set low so it sits close to the line of the roof
  • Flashings in lead or a matching kit, dressed to the covering
  • Rafters trimmed with timbers that suit the existing roof
  • Conservation area rules by nation — We check the permitted development position for your nation before the rooflight is ordered.
  • Listed building consent — We confirm listed building consent is in place before fitting any rooflight on a listed building.

What happens on the day

Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a conservation rooflight: one day, weather permitting.

Regulations for Brent properties

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

Help us quote accurately

A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, HA0 or a neighbouring district.

Common questions in Brent

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Tell us your postcode, HA0 or close by, and what you want fitted. We will reply with the next steps and a quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Conservation rooflights in Brent

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote