What the job costs in Gorseinon
Per standard unit
Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job
Per large unit
Larger or ventilating units, edge protection in place
Programme of works
Phased replacement across a building, priced from a survey
Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Gorseinon we cover
Gorseinon and the districts around it, SA4, SA5 and SA2, all sit inside our working area. So does the ground between Gorseinon and Llanelli (5 miles), and on towards Swansea (5 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
What we do on the day
- Unit schedule and handover notes for the building's records
- Kerbs checked and packed, adapted or rebuilt where needed
- Old units removed, with waste taken off site
- Working around occupied buildings — We plan noise, dust and access around the people using the building.
- Glass or polycarbonate — We compare glass and polycarbonate units against the roof, use and budget.
What happens on the day
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a commercial rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes about a day per unit, longer on big roofs.
Regulations for Gorseinon properties
Non-domestic rooflight work in Wales follows the Welsh Approved Documents: energy limits for the glazing, fire checks near boundaries and over escape routes, and building control for new openings. Planning depends on the building and its location. We set out the route on your quote.
Details that speed up your quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, SA4 or nearby, confirms travel.
Common questions in Gorseinon
How long does fitting take?
Fitting a commercial rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Do commercial rooflights need planning permission?
Like-for-like replacements on commercial buildings rarely need planning permission. New or larger rooflights on non-domestic buildings and blocks of flats usually need checking with the planning authority, because householder permitted development rights don't apply. We tell you what we know about your building and point you to the right team.
Ask for a quote for your Gorseinon roof. Survey dates are offered based on fitter availability once you are happy with the price.

