Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Evington · LE2 · Leicestershire

Commercial rooflight installation in Evington

Our guide price for commercial rooflight installation starts from £1,095, and the real figure for your roof in Evington depends on a handful of things: the size and type of commercial rooflight, whether the opening exists already, the roof covering, and how easy access is. We fix the price in a written quote before work begins. Nothing gets added on the day without your say-so. For a rough idea first, photos and a couple of measurements are enough to go on, and we cover all of Leicestershire.

Guide price from £1,095 · Supply & fit, per unit; site set-up priced separately

Guide prices in Evington

Per standard unit

£1,095 – £1,895including VAT at 20%

Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job

Per large unit

£1,895 – £3,345including VAT at 20%

Larger or ventilating units, edge protection in place

Programme of works

£3,345 – £7,195including VAT at 20%

Phased replacement across a building, priced from a survey

Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Distance is rarely the deciding factor. A roof in Oadby, 1 mile from Evington, gets the same survey, the same written quote and the same fitting process as one in LE2, LE18 and LE5. What changes the price is the job itself: size of unit, roof type, access and lifting. Wigston Magna, around 2 miles out, is treated the same way.

What we do on the day

  • Old units removed, with waste taken off site
  • New units fitted, sealed and weathered into the roof covering
  • Access, edge protection and fragile-roof covers planned before work starts
  • Fire performance near boundaries — We check how close the rooflights are to the site boundary and to escape routes.
  • Fragile roofs and rooflights — We treat every rooflight and the roof around it as fragile until we have checked it.

What happens on the day

Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a commercial rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.

Do you need permission in Evington?

For non-domestic roofs in England, expect building control involvement for new openings, energy limits of 2.2 W/m²K for rooflights, and fire checks where rooflights sit near a boundary or above an escape route. Smoke ventilation rooflights must be certified products, with controls commissioned by a specialist. We set out what applies to your building on the quote.

Before you get in touch

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around LE2 and we will come back with a quote or a survey date.

Common questions in Evington

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Do you need scaffolding to fit a rooflight?

Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

Tell us your postcode, LE2 or close by, and what you want fitted. We will reply with the next steps and a quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Commercial rooflights in Evington

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote