Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Swanscombe · DA10 · Kent

Commercial rooflight installation in Swanscombe

Plenty of rooflight trouble starts with a tape measure. Units are often sold by the builder's opening, meaning the hole in the roof, rather than the overall external size, and confusing the two leaves you with a frame that does not suit the opening. Before we fit any commercial rooflight in Swanscombe, we measure the opening, the upstand or kerb where there is one, and the finished roof level, then compare them with the maker's drawing. If something is out, you hear about it before the fitting day rather than on it. That single check keeps most jobs like this on track.

Guide price from £1,095 · Supply & fit, per unit; site set-up priced separately

Swanscombe guide prices

Per standard unit

£1,095 – £1,895including VAT at 20%

Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job

Per large unit

£1,895 – £3,345including VAT at 20%

Larger or ventilating units, edge protection in place

Programme of works

£3,345 – £7,195including VAT at 20%

Phased replacement across a building, priced from a survey

Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Coverage in and around Swanscombe

Jobs across DA10, DA9 and DA11 are part of our normal cover for Swanscombe. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Grays and Gravesend are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.

Included in the work

  • New units fitted, sealed and weathered into the roof covering
  • Roof survey of every unit, kerb and the fragile areas around them
  • Old units removed, with waste taken off site
  • Working around occupied buildings — We plan noise, dust and access around the people using the building.
  • Energy limits for non-domestic roofs — We check new units against the energy limits for non-domestic buildings.

A typical installation day

Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a commercial rooflight: about a day per unit, longer on big roofs, weather permitting.

Planning, building control and Swanscombe

For non-domestic roofs in England, expect building control involvement for new openings, energy limits of 2.2 W/m²K for rooflights, and fire checks where rooflights sit near a boundary or above an escape route. Smoke ventilation rooflights must be certified products, with controls commissioned by a specialist. We set out what applies to your building on the quote.

What to send for a quick quote

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, DA10 or nearby, confirms travel.

Common questions in Swanscombe

Will my new commercial rooflight leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

Do commercial rooflights need planning permission?

Like-for-like replacements on commercial buildings rarely need planning permission. New or larger rooflights on non-domestic buildings and blocks of flats usually need checking with the planning authority, because householder permitted development rights don't apply. We tell you what we know about your building and point you to the right team.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Send a few photos and your DA10 postcode, and we will put together a written quote for the job.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Commercial rooflights in Swanscombe

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote