Havant guide prices
Per standard unit
Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job
Per large unit
Larger or ventilating units, edge protection in place
Programme of works
Phased replacement across a building, priced from a survey
Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Covering Havant means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in PO9, PO7 and PO6, and are happy to quote further out in Emsworth and Waterlooville. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.
What we do on the day
- Access, edge protection and fragile-roof covers planned before work starts
- Kerbs checked and packed, adapted or rebuilt where needed
- New units fitted, sealed and weathered into the roof covering
- Fire performance near boundaries — We check how close the rooflights are to the site boundary and to escape routes.
- Fragile roofs and rooflights — We treat every rooflight and the roof around it as fragile until we have checked it.
How a fitting day runs
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a commercial rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Do you need permission in Havant?
On commercial buildings in England, new rooflights and changes to roof structure go through building control, and replacements in non-dwellings also need building control involvement unless fitted by a scheme-registered installer, which we are not; load-bearing or structural glass always goes through building control. Fire rules matter near boundaries and over escape routes, and smoke vents must be certified to BS EN 12101-2. We confirm the route and the paperwork for your building before work starts.
Details that speed up your quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, PO9 or nearby, confirms travel.
Common questions in Havant
What upstand height and roof pitch does commercial rooflight fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
How long does fitting take?
Fitting a commercial rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Does commercial rooflight work need building control?
Usually. New openings, structural changes and smoke vents go through building control, and on buildings covered by fire safety law that means a full plans application rather than a building notice. We are not registered with a competent person scheme, so replacements we fit are notified to building control. We confirm the route and show any fee on the quote.
Ask for a quote for your Havant roof. Survey dates are offered based on fitter availability once you are happy with the price.

