Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Eastleigh · SO50 · Hampshire

Commercial rooflight installation in Eastleigh

Builders and extension firms in Eastleigh often want the rooflight stage of a project handled by a specialist fitting team. We step in once the roof deck or battens are ready, fit a commercial rooflight on your upstand or ours, detail it into the membrane or tiles, and leave the opening ready for the plasterer. Homeowners get exactly the same service directly. In each case the job is quoted in writing first, with any access or lifting needs spelt out. Jobs around SO50 and the neighbouring districts are welcome.

Guide price from £1,095 · Supply & fit, per unit; site set-up priced separately

What the job costs in Eastleigh

Per standard unit

£1,095 – £1,895including VAT at 20%

Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job

Per large unit

£1,895 – £3,345including VAT at 20%

Larger or ventilating units, edge protection in place

Programme of works

£3,345 – £7,195including VAT at 20%

Phased replacement across a building, priced from a survey

Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering SO50 and neighbouring districts

Distance is rarely the deciding factor. A roof in Bishopstoke, 1 mile from Eastleigh, gets the same survey, the same written quote and the same fitting process as one in SO50, SO53 and SO18. What changes the price is the job itself: size of unit, roof type, access and lifting. Hedge End, around 4 miles out, is treated the same way.

What we do on the day

  • New units fitted, sealed and weathered into the roof covering
  • Phasing agreed so occupied areas stay dry and usable
  • Unit schedule and handover notes for the building's records
  • Energy limits for non-domestic roofs — We check new units against the energy limits for non-domestic buildings.
  • Fragile roofs and rooflights — We treat every rooflight and the roof around it as fragile until we have checked it.

A typical installation day

On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a commercial rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.

Regulations for Eastleigh properties

On commercial buildings in England, new rooflights and changes to roof structure go through building control, and replacements in non-dwellings also need building control involvement unless fitted by a scheme-registered installer, which we are not; load-bearing or structural glass always goes through building control. Fire rules matter near boundaries and over escape routes, and smoke vents must be certified to BS EN 12101-2. We confirm the route and the paperwork for your building before work starts.

Getting a price from photos

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, SO50 or nearby, confirms travel.

Common questions in Eastleigh

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

How long does fitting take?

Fitting a commercial rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

What upstand height and roof pitch does commercial rooflight fitting need?

It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

Tell us your postcode, SO50 or close by, and what you want fitted. We will reply with the next steps and a quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Commercial rooflights in Eastleigh

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote