Guide prices in County Fermanagh
Per standard unit
Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job
Per large unit
Larger or ventilating units, edge protection in place
Programme of works
Phased replacement across a building, priced from a survey
Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in County Fermanagh
County Fermanagh is part of our normal coverage in Northern Ireland. Fitting teams travel out to the property, so a town-centre terrace and a house down a farm track are treated alike, as long as a fitter can get the unit to the roof safely. Dates are offered according to fitter availability, and the cost of travel is already in your written quote.
Included in the work
- Kerbs checked and packed, adapted or rebuilt where needed
- Roof survey of every unit, kerb and the fragile areas around them
- Unit schedule and handover notes for the building's records
- Fragile roofs and rooflights — We treat every rooflight and the roof around it as fragile until we have checked it.
- Fire performance near boundaries — We check how close the rooflights are to the site boundary and to escape routes.
Rules that apply in Northern Ireland
On commercial buildings in Northern Ireland, rooflight openings and roof alterations go through building control, with energy and fire requirements for the glazing set out in the Technical Booklets. Smoke vents must be certified products with controls commissioned by a specialist. We confirm the route for your building.
Common questions in County Fermanagh
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
How long does fitting take?
Fitting a commercial rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
What if my roof opening is the wrong size for the commercial rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

