Guide prices in Sandown
Up to 1 m²
Laminated walk-on unit with anti-slip finish, fitted level with the terrace
Up to 2 m²
Larger walk-on glazing
Large or bespoke
Big panes, structural calculations, lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering PO36 and neighbouring districts
Sandown and the districts around it, PO36, PO37 and PO35, all sit inside our working area. So does the ground between Sandown and Ryde (5 miles), and on towards Newport (7 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
What we check on a supplied unit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a walk-on rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
Included in the work
- Support frame or upstand prepared to the approved structural design
- Lifting plan for the unit, including people or gear for the day
- Drainage around the unit checked so water does not lie on the glass
- Structural calculations — We need structural calculations for the glass and its support before a walk-on job goes ahead.
- Weight on delivery day — We plan the delivery and lift before booking any lifting gear or extra hands.
From arrival to clean-up
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a walk-on rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Do you need permission in Sandown?
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Getting a price from photos
For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as PO36.
Common questions in Sandown
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
Got a unit waiting to go in, or need one sourced? Either way, start with your Sandown address and a couple of photos.