Guide prices in Rochdale
Up to 1 m²
Laminated walk-on unit with anti-slip finish, fitted level with the terrace
Up to 2 m²
Larger walk-on glazing
Large or bespoke
Big panes, structural calculations, lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Rochdale we cover
Rochdale and the districts around it, OL16, OL11 and OL12, all sit inside our working area. So does the ground between Rochdale and Heywood (3 miles), and on towards Royton (4 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
What we check on a supplied unit
Supply and fit tends to suit people who would rather not pick a unit from a catalogue. We look at the roof, the opening and how you use the room, then put a walk-on rooflight on the quote that fits all three. Fit-only suits people who already know what they want, or have one on site. We are happy with either. The difference is who stands behind what: on fit-only, the maker or retailer covers the product, and our workmanship guarantee covers the installation.
What we do on the day
- Engineer's calculations and the unit's loading data checked together
- Protective film removed and the anti-slip surface left clean
- Support frame or upstand prepared to the approved structural design
- Structural calculations — We need structural calculations for the glass and its support before a walk-on job goes ahead.
- Weight on delivery day — We plan the delivery and lift before booking any lifting gear or extra hands.
Fitting your walk-on rooflight, step by step
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a walk-on rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one to two days.
Planning and building rules in England
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
Before you get in touch
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, OL16 or a neighbouring district.
Common questions in Rochdale
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Do you cover Rochdale?
Yes. Fitters travel to addresses in Rochdale and the surrounding districts, including OL16. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
Questions before you commit? Send them over with your Rochdale postcode and we will answer them plainly, with a quote alongside.