Guide prices in County Fermanagh
Up to 1 m²
Laminated walk-on unit with anti-slip finish, fitted level with the terrace
Up to 2 m²
Larger walk-on glazing
Large or bespoke
Big panes, structural calculations, lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in County Fermanagh
Fitting across County Fermanagh means planning routes, access and lifting as well as the roof itself. Narrow lanes, shared driveways and town-centre parking restrictions all affect how a large unit is delivered and raised to roof level. We ask about these early so the quote reflects them. That approach is the same everywhere we work in Northern Ireland, from single domestic jobs to multi-unit commercial sites.
What we do on the day
- Protective film removed and the anti-slip surface left clean
- Drainage around the unit checked so water does not lie on the glass
- Support frame or upstand prepared to the approved structural design
- Structural calculations — We need structural calculations for the glass and its support before a walk-on job goes ahead.
- Units tested to old standards — We check which standard the walk-on unit has been tested to.
Rules that apply in Northern Ireland
Northern Ireland has its own rules. Permitted development for rooflights on a house requires the unit to sit below the highest part of the roof, project no more than 15 cm where the slope faces a road, and stay at least half a metre from the ridge, eaves, party wall and verge. It doesn't apply in conservation areas or within the grounds of a listed building. For building control, structural roof alterations need an application, and rooflights must meet WER Band C or 1.6 W/m²K.
Common questions in County Fermanagh
How long does fitting take?
Fitting a walk-on rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
What if my roof opening is the wrong size for the walk-on rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

