Guide prices in Newbury
Up to 1 m²
Laminated walk-on unit with anti-slip finish, fitted level with the terrace
Up to 2 m²
Larger walk-on glazing
Large or bespoke
Big panes, structural calculations, lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering RG14 and neighbouring districts
Covering Newbury means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in RG14, RG20 and RG19, and are happy to quote further out in Thatcham and Tadley. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.
Buying your own, or letting us supply
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a walk-on rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
On the day, we cover
- Drainage around the unit checked so water does not lie on the glass
- Perimeter joints sealed and the waterproofing lapped as the maker shows
- Engineer's calculations and the unit's loading data checked together
- Units tested to old standards — We check which standard the walk-on unit has been tested to.
- Weight on delivery day — We plan the delivery and lift before booking any lifting gear or extra hands.
From arrival to clean-up
Where a job takes one to two days, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a walk-on rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Planning and building rules in England
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Help us quote accurately
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, RG14 or nearby, confirms travel.
Common questions in Newbury
How long does fitting take?
Fitting a walk-on rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Will my new walk-on rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Get in touch with the details of your Newbury property and we will explain what the job involves and what it costs.