Guide prices
Per flat rooflight
Fit a supplied unit to your prepared upstand, sealed and trimmed
Per roof lantern
Assemble and glaze a supplied lantern on your upstand
Two-person day rate
Fitting team for multi-unit or mixed work
Guide ranges for labour only, ex VAT for trade accounts. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around West Bromwich we cover
Jobs across B70, B71 and B69 are part of our normal cover for West Bromwich. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Smethwick and Wednesbury are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.
On the day, we cover
- A short note of anything we found that needs your attention
- Upstands built by us where you would rather not
- Supplied units checked against your schedule before fitting
- Programme and access — We confirm site access, lifting arrangements and working hours before the visit.
- Building control sign-off — We agree with you how building control is handled before fitting.
Fitting your rooflight, step by step
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Planning, building control and West Bromwich
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we agree up front who notifies it. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
What to send for a quick quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around B70 and we will come back with a quote or a survey date.
Common questions in West Bromwich
How long does fitting take?
Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Who deals with building control on trade jobs?
On new-build and extension work the rooflights usually sit within your approval or warrant. On replacements in homes in England and Wales we agree up front who notifies building control; we are not registered with a competent person scheme, so we cannot self-certify.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Builders and roofers in West Bromwich: send the spec and the site address for a written trade price.

