Guide prices
Per flat rooflight
Fit a supplied unit to your prepared upstand, sealed and trimmed
Per roof lantern
Assemble and glaze a supplied lantern on your upstand
Two-person day rate
Fitting team for multi-unit or mixed work
Guide ranges for labour only, ex VAT for trade accounts. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Fitting across Hebburn and nearby
Distance is rarely the deciding factor. A roof in Jarrow, 1 mile from Hebburn, gets the same survey, the same written quote and the same fitting process as one in NE31, NE32 and NE28. What changes the price is the job itself: size of unit, roof type, access and lifting. Wallsend, around 1 mile out, is treated the same way.
What the job includes
- Pitched roof windows fitted with their flashing kits
- Upstands checked for size, height, level and square
- Upstands built by us where you would rather not
- Upstand ready and to size — We ask for the upstands to be built to the maker's drawing before we arrive.
- Programme and access — We confirm site access, lifting arrangements and working hours before the visit.
How a fitting day runs
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning, building control and Hebburn
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Details that speed up your quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, NE31 or nearby, confirms travel.
Common questions in Hebburn
How long does fitting take?
Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Who deals with building control on trade jobs?
On new-build and extension work the rooflights usually sit within your approval or warrant. On replacements in homes in England and Wales we agree up front who notifies building control; we are not registered with a competent person scheme, so we cannot self-certify.
Running a job in Hebburn? Send the drawings or unit details and we will price the fitting, plus VAT, in writing.