Woking guide prices
Per flat rooflight
Fit a supplied unit to your prepared upstand, sealed and trimmed
Per roof lantern
Assemble and glaze a supplied lantern on your upstand
Two-person day rate
Fitting team for multi-unit or mixed work
Guide ranges for labour only, ex VAT for trade accounts. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Woking and the districts around it, GU22, GU21 and GU23, all sit inside our working area. So does the ground between Woking and Chertsey (5 miles), and on towards Weybridge (6 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
What the job includes
- Roof lanterns assembled and glazed on your upstand
- Upstands checked for size, height, level and square
- Flat rooflights fitted, sealed and trimmed on your kerbs
- Programme and access — We confirm site access, lifting arrangements and working hours before the visit.
- Upstand ready and to size — We ask for the upstands to be built to the maker's drawing before we arrive.
A typical installation day
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Do you need permission in Woking?
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so on trade replacements we agree up front who notifies building control, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Getting a price from photos
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around GU22 and we will come back with a quote or a survey date.
Common questions in Woking
Who deals with building control on trade jobs?
On new-build and extension work the rooflights usually sit within your approval or warrant. On replacements in homes in England and Wales we agree up front who notifies building control; we are not registered with a competent person scheme, so we cannot self-certify.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Running a job in Woking? Send the drawings or unit details and we will price the fitting, plus VAT, in writing.

