Grangemouth guide prices
Per flat rooflight
Fit a supplied unit to your prepared upstand, sealed and trimmed
Per roof lantern
Assemble and glaze a supplied lantern on your upstand
Two-person day rate
Fitting team for multi-unit or mixed work
Guide ranges for labour only, ex VAT for trade accounts. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Where our fitters travel
Our fitters come to you. For Grangemouth that covers FK3, FK2 and FK1, plus nearby Falkirk and Alloa. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
What we do on the day
- Roof lanterns assembled and glazed on your upstand
- Pitched roof windows fitted with their flashing kits
- Upstands checked for size, height, level and square
- Programme and access — We confirm site access, lifting arrangements and working hours before the visit.
- Building control sign-off — We agree with you how building control is handled before fitting.
How a fitting day runs
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes half a day to a day per unit.
Planning and building rules in Scotland
In Scotland, forming a new rooflight opening needs a building warrant from the council, because the roof is being altered. Replacing an existing rooflight complete with its frame doesn't need a warrant, but the new unit still has to meet the building standards, including the 1.6 W/m²K energy figure for windows and rooflights in alterations. Planning depends on the house and where it is: householder permitted development rights don't apply in conservation areas, and listed buildings need consent. We confirm this with you before quoting.
Help us quote accurately
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, FK3 or nearby, confirms travel.
Common questions in Grangemouth
Who deals with building control on trade jobs?
On new-build and extension work the rooflights usually sit within your approval or warrant. On replacements in homes in England and Wales we agree up front who notifies building control; we are not registered with a competent person scheme, so we cannot self-certify.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
How long does fitting take?
Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
For trade fitting around FK3, send the unit spec and site details for a written price.

