What the job costs in Paisley
Like-for-like swap
Old dome or unit removed and disposed of, new glass rooflight fitted to the existing sound kerb
New upstand and swap
Old kerb taken off, new insulated upstand built, roof covering made good, new unit fitted
Opening or large unit
Electric or larger replacement, including making good inside
Guide ranges for supply & fit; building control notice fee extra in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Coverage in and around Paisley
Our fitters come to you. For Paisley that covers PA2, PA1 and PA3, plus nearby Barrhead and Renfrew. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
Fit-only or supply and fit
Your unit or ours, the fitting standard is the same. For supply and fit we choose a replacement rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
What we do on the day
- Internal reveal made good where the old trim or plaster was damaged
- Roof membrane repaired and turned up where it meets the kerb
- Packers, an adaptor or a new insulated upstand where the old kerb falls short
- Inside finishes — We check the condition of the plaster and trim around the opening from inside.
- Is the kerb worth keeping? — We decide whether the existing kerb can stay only after checking it for rot, height and squareness.
A typical installation day
Morning first: the team arrives, introduces itself and walks through the job with you. Dust sheets go down in the room below and along the route in. Then the opening and upstand, or the flashing on a pitched roof, are checked against the unit's measurements. A replacement rooflight goes in, is fixed to the maker's pattern and sealed into the roof covering. Inside, the reveal is finished as quoted. Before leaving, the team clears debris and talks you through what was done. Most jobs of this type take one day.
Regulations for Paisley properties
If you live in Scotland, the key question is whether the job is new or a replacement. A new rooflight needs a building warrant. Swapping an old rooflight for a new one, frame included, doesn't, as long as the new unit meets the standards: the energy figure for new or replacement rooflights in alterations is 1.6 W/m²K. Conservation areas have no householder permitted development rights for roof alterations, and listed buildings need listed building consent.
Before you get in touch
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around PA2. That is enough for a first price.
Common questions in Paisley
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
How long does fitting take?
Fitting a replacement rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Will my new replacement rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
For a free, no-obligation quote in Paisley, use the form or call us with the details of your roof.

