Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Havant · PO9 · Hampshire

Rooflight replacement in Havant

Glass is heavy, and bigger units get heavy fast. Fitting a replacement rooflight in Havant means planning how it travels from the delivery vehicle to the roof without chipping an edge or straining a back. Smaller units go up by hand with two fitters. Larger ones may need a hoist, a scaffold loading bay or a crane, and we tell you at quote stage if that applies. Once it is up, the fitting follows the maker's sequence: seat, fix, seal, finish. We take on work like this across Hampshire.

Guide price from £1,095 · Supply & fit; building control notice fee extra in England and Wales

Guide prices

Like-for-like swap

£1,095 – £1,695including VAT at 20%

Old dome or unit removed and disposed of, new glass rooflight fitted to the existing sound kerb

New upstand and swap

£1,695 – £2,645including VAT at 20%

Old kerb taken off, new insulated upstand built, roof covering made good, new unit fitted

Opening or large unit

£2,645 – £4,545including VAT at 20%

Electric or larger replacement, including making good inside

Guide ranges for supply & fit; building control notice fee extra in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering PO9 and neighbouring districts

If you also own a property or a business unit in Emsworth, Waterlooville or Hayling Island, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and PO9, PO7 and PO6 sit comfortably within that pattern.

Buying your own, or letting us supply

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a replacement rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

On the day, we cover

  • Packers, an adaptor or a new insulated upstand where the old kerb falls short
  • Roof membrane repaired and turned up where it meets the kerb
  • Kerb inspected for rot, height, level and fall once the old unit is off
  • Dome to glass upgrades — We check that the opening and kerb suit a flat glass unit before quoting a dome-to-glass swap.
  • Is the kerb worth keeping? — We decide whether the existing kerb can stay only after checking it for rot, height and squareness.

What happens on the day

On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a replacement rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.

Do you need permission in Havant?

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

Getting a price from photos

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, PO9 or nearby, confirms travel.

Common questions in Havant

What if my roof opening is the wrong size for the replacement rooflight?

We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

What upstand height and roof pitch does replacement rooflight fitting need?

It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Planning a replacement rooflight in Havant? Tell us about the roof and we will come back with a clear price in writing.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Replacements in Havant

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote