What the job costs in Willesden
Like-for-like swap
Old dome or unit removed and disposed of, new glass rooflight fitted to the existing sound kerb
New upstand and swap
Old kerb taken off, new insulated upstand built, roof covering made good, new unit fitted
Opening or large unit
Electric or larger replacement, including making good inside
Guide ranges for supply & fit; building control notice fee extra in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering NW10 and neighbouring districts
Willesden and the districts around it, NW10, W10 and NW6, all sit inside our working area. So does the ground between Willesden and Harlesden (1 mile), and on towards Cricklewood (2 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
Buying your own, or letting us supply
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a replacement rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
On the day, we cover
- Building notice given to the council in England and Wales, with its fee on the quote
- Packers, an adaptor or a new insulated upstand where the old kerb falls short
- Internal reveal made good where the old trim or plaster was damaged
- Leaks that are not the rooflight — We look at the roof around the unit before blaming the rooflight.
- Inside finishes — We check the condition of the plaster and trim around the opening from inside.
From arrival to clean-up
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a replacement rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning and building rules in England
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Help us quote accurately
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around NW10 and we will come back with a quote or a survey date.
Common questions in Willesden
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
What if my roof opening is the wrong size for the replacement rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
Questions before you commit? Send them over with your Willesden postcode and we will answer them plainly, with a quote alongside.