Ilford guide prices
Like-for-like swap
Old dome or unit removed and disposed of, new glass rooflight fitted to the existing sound kerb
New upstand and swap
Old kerb taken off, new insulated upstand built, roof covering made good, new unit fitted
Opening or large unit
Electric or larger replacement, including making good inside
Guide ranges for supply & fit; building control notice fee extra in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Ilford and the districts around it, IG1, E12 and IG2, all sit inside our working area. So does the ground between Ilford and Manor Park (1 mile), and on towards Barking (2 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
Already bought your unit?
If you have bought a replacement rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.
Included in the work
- Packers, an adaptor or a new insulated upstand where the old kerb falls short
- Old rooflight or dome unscrewed, lifted out and taken away for disposal
- New unit bedded, fixed and sealed exactly as its maker shows
- Inside finishes — We check the condition of the plaster and trim around the opening from inside.
- Energy rules for the new unit — We make sure the replacement meets the current energy limit, not just the old unit's performance.
How a fitting day runs
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a replacement rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one day.
Planning and building rules in England
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
What to send for a quick quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, IG1 or nearby, confirms travel.
Common questions in Ilford
Will my new replacement rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
How long does fitting take?
Fitting a replacement rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Send a few photos and your IG1 postcode, and we will put together a written quote for the job.