Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Chelsea · SW3 · Greater London

Rooflight replacement in Chelsea

Plenty of rooflight trouble starts with a tape measure. Units are often sold by the builder's opening, meaning the hole in the roof, rather than the overall external size, and confusing the two leaves you with a frame that does not suit the opening. Before we fit any replacement rooflight in Chelsea, we measure the opening, the upstand or kerb where there is one, and the finished roof level, then compare them with the maker's drawing. If something is out, you hear about it before the fitting day rather than on it. That single check keeps most jobs like this on track.

Guide price from £1,095 · Supply & fit; building control notice fee extra in England and Wales

What the job costs in Chelsea

Like-for-like swap

£1,095 – £1,695including VAT at 20%

Old dome or unit removed and disposed of, new glass rooflight fitted to the existing sound kerb

New upstand and swap

£1,695 – £2,645including VAT at 20%

Old kerb taken off, new insulated upstand built, roof covering made good, new unit fitted

Opening or large unit

£2,645 – £4,545including VAT at 20%

Electric or larger replacement, including making good inside

Guide ranges for supply & fit; building control notice fee extra in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Coverage in and around Chelsea

Fitters travel to the job, so the address is what counts. In Chelsea that means postcode districts SW3, SW10 and SW7, and the same teams can just as easily take on work in Battersea, about 1 mile away, or Kensington at roughly 1 mile. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

Your replacement rooflights or ours

Your unit or ours, the fitting standard is the same. For supply and fit we choose a replacement rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.

On the day, we cover

  • Old rooflight or dome unscrewed, lifted out and taken away for disposal
  • Building notice given to the council in England and Wales, with its fee on the quote
  • Kerb inspected for rot, height, level and fall once the old unit is off
  • Is the kerb worth keeping? — We decide whether the existing kerb can stay only after checking it for rot, height and squareness.
  • Inside finishes — We check the condition of the plaster and trim around the opening from inside.

From arrival to clean-up

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a replacement rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one day.

Planning, building control and Chelsea

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

Details that speed up your quote

For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as SW3.

Common questions in Chelsea

How long does fitting take?

Fitting a replacement rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Ask for a quote for your Chelsea roof. Survey dates are offered based on fitter availability once you are happy with the price.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Replacements in Chelsea

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote