Stanley guide prices
Like-for-like swap
Old dome or unit removed and disposed of, new glass rooflight fitted to the existing sound kerb
New upstand and swap
Old kerb taken off, new insulated upstand built, roof covering made good, new unit fitted
Opening or large unit
Electric or larger replacement, including making good inside
Guide ranges for supply & fit; building control notice fee extra in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering DH9 and neighbouring districts
Looking at a property near Stanley but not quite in it? We work across DH9, DH2 and DH3 and outwards to Chester-le-Street, Consett and Whickham. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Stanley.
What we check on a supplied unit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a replacement rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
On the day, we cover
- Old rooflight or dome unscrewed, lifted out and taken away for disposal
- Building notice given to the council in England and Wales, with its fee on the quote
- Packers, an adaptor or a new insulated upstand where the old kerb falls short
- Is the kerb worth keeping? — We decide whether the existing kerb can stay only after checking it for rot, height and squareness.
- Dome to glass upgrades — We check that the opening and kerb suit a flat glass unit before quoting a dome-to-glass swap.
What happens on the day
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a replacement rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Do you need permission in Stanley?
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
What to send for a quick quote
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, DH9 or a neighbouring district.
Common questions in Stanley
What if my roof opening is the wrong size for the replacement rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Tell us your postcode, DH9 or close by, and what you want fitted. We will reply with the next steps and a quote.