Guide prices in Tyne and Wear
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in Tyne and Wear
From the larger towns to the smaller places in between, we take on rooflight fitting across Tyne and Wear. The process is the same for a terrace, a farmhouse extension or an industrial unit: details first, written quote second, fitting day third. Remote and island addresses in England, where they arise, are covered by arrangement, and we tell you that before quoting.
- Glass replacement in Blaydon-on-Tyne
- Glass replacement in Felling
- Glass replacement in Gateshead
- Glass replacement in Gosforth
- Glass replacement in Hebburn
- Glass replacement in Houghton-Le-Spring
- Glass replacement in Jarrow
- Glass replacement in Newburn
- Glass replacement in Newcastle upon Tyne
- Glass replacement in North Shields
- Glass replacement in South Shields
- Glass replacement in Sunderland
- Glass replacement in Tynemouth
- Glass replacement in Wallsend
- Glass replacement in Washington
- Glass replacement in Whickham
- Glass replacement in Whitley Bay
What the job includes
- New glazing tapes, gaskets or sealant fitted to suit the frame
- New unit set on packers, then beaded, capped or bonded as designed
- Frame rebate cleaned and checked for damage, corrosion or failed seals
- Condition of the frame — We look at the frame closely before committing to new glass.
- Can the glass come out? — We check whether your rooflight has removable glass or a bonded unit before booking a fitting visit.
Rules that apply in England
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Common questions in Tyne and Wear
Can I upgrade the glass while it is being replaced?
Usually. Solar-control, self-cleaning, toughened or laminated glass can be specified as long as the frame can take the thickness and weight. We check that on the measuring visit and price the options side by side.
Is the measuring visit charged?
Yes. The first visit measures the existing glass and checks the frame, and it is charged. We confirm that price before you book. The fitting of the new glass is then priced in writing, so you see the full cost before anything is ordered.
Is new glass or a new rooflight better value?
If the frame, gaskets and drainage are sound, new glass is usually the cheaper fix. If the frame is cracked, distorted or leaking at the kerb, a full replacement is better value. After the measuring visit we price both so you can compare.

