Guide prices
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Shrewsbury we cover
Shrewsbury and the districts around it, SY1, SY2 and SY3, all sit inside our working area. So does the ground between Shrewsbury and Wellington (10 miles), and on towards Telford (13 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
On the day, we cover
- New unit set on packers, then beaded, capped or bonded as designed
- Frame rebate cleaned and checked for damage, corrosion or failed seals
- Old glass taken out safely and removed from site
- Can the glass come out? — We check whether your rooflight has removable glass or a bonded unit before booking a fitting visit.
- Weight and lifting — We plan how a heavy pane gets onto the roof and into the frame.
How the glass is replaced
The second visit is the quick one. With the new unit made to size, the fitters take the old glass out, check the frame and drainage paths, and set the new glass on packers so it sits square and drains properly. Seals and cappings are renewed where needed, the area is cleared, and you are shown what was done.
Planning and building rules in England
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
What to send us
To price the measuring visit, send a photo of the rooflight from inside showing the misting or crack, one from outside if you can reach a safe viewpoint, and the rough size of the glass. If you know the make or have the original paperwork, include that too, along with the postcode.
Common questions in Shrewsbury
Can you replace just the glass in my rooflight?
Often, yes. If the frame, gaskets and drainage are sound, a new sealed unit can go into the existing frame. If the frame has failed, is distorted or leaks around the edge, replacing the whole rooflight is usually the better answer, and we tell you that.
How long does new rooflight glass take?
The new sealed unit is made to the measured size, so there is a gap between the measuring visit and the fitting visit while it is produced. We give you the expected timing when we price the glass, and book the fitting once it has arrived.
Is the measuring visit charged?
Yes. The first visit measures the existing glass and checks the frame, and it is charged. We confirm that price before you book. The fitting of the new glass is then priced in writing, so you see the full cost before anything is ordered.
Got a leak or a misted unit in Shrewsbury? Send photos first and we will tell you what the visit costs before booking.