Guide prices
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering CH60 and neighbouring districts
Looking at a property near Heswall but not quite in it? We work across CH60, CH61 and CH49 and outwards to Neston, Bebington and Moreton. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Heswall.
On the day, we cover
- Joints water tested and the glass cleaned inside and out
- Measuring visit to size the glass and identify its make-up
- Frame rebate cleaned and checked for damage, corrosion or failed seals
- Condition of the frame — We look at the frame closely before committing to new glass.
- Weight and lifting — We plan how a heavy pane gets onto the roof and into the frame.
How the glass is replaced
On the fitting visit, the room below is protected first. The beads or cappings come off, the old unit is lifted out with suction lifters, and the rebate is cleaned and checked for damage or blocked drainage. The new sealed unit goes in on fresh packers and gaskets, the cappings are refitted and sealed, and the glass is cleaned. Most glass swaps take half a day once the new glass is made.
Planning, building control and Heswall
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
What to send us
Photos of the problem glass from inside and out, a rough width and length, and whether the rooflight opens or is fixed are enough to price the first visit. Add the postcode and how the roof is reached, and tell us if more than one unit has misted.
Common questions in Heswall
Can I upgrade the glass while it is being replaced?
Usually. Solar-control, self-cleaning, toughened or laminated glass can be specified as long as the frame can take the thickness and weight. We check that on the measuring visit and price the options side by side.
Is new glass or a new rooflight better value?
If the frame, gaskets and drainage are sound, new glass is usually the cheaper fix. If the frame is cracked, distorted or leaking at the kerb, a full replacement is better value. After the measuring visit we price both so you can compare.
Is the measuring visit charged?
Yes. The first visit measures the existing glass and checks the frame, and it is charged. We confirm that price before you book. The fitting of the new glass is then priced in writing, so you see the full cost before anything is ordered.
Got a leak or a misted unit in Heswall? Send photos first and we will tell you what the visit costs before booking.

