What the job costs in Stirling
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Coverage in and around Stirling
Jobs across FK9, FK7 and FK11 are part of our normal cover for Stirling. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Alloa and Falkirk are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.
On the day, we cover
- New glazing tapes, gaskets or sealant fitted to suit the frame
- Old glass taken out safely and removed from site
- Frame rebate cleaned and checked for damage, corrosion or failed seals
- Matching the glass make-up — We identify the existing glass so the replacement performs at least as well.
- Weight and lifting — We plan how a heavy pane gets onto the roof and into the frame.
How the glass is replaced
The second visit is the quick one. With the new unit made to size, the fitters take the old glass out, check the frame and drainage paths, and set the new glass on packers so it sits square and drains properly. Seals and cappings are renewed where needed, the area is cleared, and you are shown what was done.
Planning and building rules in Scotland
If you live in Scotland, the key question is whether the job is new or a replacement. A new rooflight needs a building warrant. Swapping an old rooflight for a new one, frame included, doesn't, as long as the new unit meets the standards: the energy figure for new or replacement rooflights in alterations is 1.6 W/m²K. Conservation areas have no householder permitted development rights for roof alterations, and listed buildings need listed building consent.
What to send us
Photos of the problem glass from inside and out, a rough width and length, and whether the rooflight opens or is fixed are enough to price the first visit. Add the postcode and how the roof is reached, and tell us if more than one unit has misted.
Common questions in Stirling
Is the measuring visit charged?
Yes. The first visit measures the existing glass and checks the frame, and it is charged. We confirm that price before you book. The fitting of the new glass is then priced in writing, so you see the full cost before anything is ordered.
Is new glass or a new rooflight better value?
If the frame, gaskets and drainage are sound, new glass is usually the cheaper fix. If the frame is cracked, distorted or leaking at the kerb, a full replacement is better value. After the measuring visit we price both so you can compare.
How long does new rooflight glass take?
The new sealed unit is made to the measured size, so there is a gap between the measuring visit and the fitting visit while it is produced. We give you the expected timing when we price the glass, and book the fitting once it has arrived.
Send photos of the problem in Stirling and we will price the visit before you book it.

