Flint guide prices
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Flint we cover
Distance is rarely the deciding factor. A roof in Deeside, 5 miles from Flint, gets the same survey, the same written quote and the same fitting process as one in CH6, CH5 and CH8. What changes the price is the job itself: size of unit, roof type, access and lifting. Buckley, around 6 miles out, is treated the same way.
Included in the work
- Old glass taken out safely and removed from site
- Sealed unit ordered to match or improve on the original glass
- New glazing tapes, gaskets or sealant fitted to suit the frame
- Condition of the frame — We look at the frame closely before committing to new glass.
- Condensation or a failed seal — We confirm whether the mist is inside the sealed unit or on the room-side surface.
How the glass is replaced
On the fitting visit, the room below is protected first. The beads or cappings come off, the old unit is lifted out with suction lifters, and the rebate is cleaned and checked for damage or blocked drainage. The new sealed unit goes in on fresh packers and gaskets, the cappings are refitted and sealed, and the glass is cleaned. Most glass swaps take half a day once the new glass is made.
Planning and building rules in Wales
Welsh rules differ from England's in one important way: rooflights lose permitted development rights in conservation areas, National Parks, AONBs and World Heritage Sites. Elsewhere on a house, a rooflight that projects no more than 150 mm and stays below the highest part of the roof is usually fine. Building regulations still apply to new openings, replacements we fit go through a building notice because we are not scheme-registered, and the energy limit for rooflights is 2.2 W/m²K. A new Welsh Approved Document L takes effect on 4 March 2027.
What to send us
Photos of the problem glass from inside and out, a rough width and length, and whether the rooflight opens or is fixed are enough to price the first visit. Add the postcode and how the roof is reached, and tell us if more than one unit has misted.
Common questions in Flint
How long does new rooflight glass take?
The new sealed unit is made to the measured size, so there is a gap between the measuring visit and the fitting visit while it is produced. We give you the expected timing when we price the glass, and book the fitting once it has arrived.
Can you replace just the glass in my rooflight?
Often, yes. If the frame, gaskets and drainage are sound, a new sealed unit can go into the existing frame. If the frame has failed, is distorted or leaks around the edge, replacing the whole rooflight is usually the better answer, and we tell you that.
Is the measuring visit charged?
Yes. The first visit measures the existing glass and checks the frame, and it is charged. We confirm that price before you book. The fitting of the new glass is then priced in writing, so you see the full cost before anything is ordered.
Send photos of the problem in Flint and we will price the visit before you book it.