Guide prices
Standard window
Centre-pivot roof window with flashing kit, tiles cut and refitted, inner lining
Larger or top-hung
Bigger or top-hung windows, or two in the same roof
Electric or pair
Electric or solar windows, or a matched pair with blinds
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Distance is rarely the deciding factor. A roof in Ellesmere Port, 6 miles from Chester, gets the same survey, the same written quote and the same fitting process as one in CH1, CH2 and CH3. What changes the price is the job itself: size of unit, roof type, access and lifting. Neston, around 9 miles out, is treated the same way.
Fit-only or supply and fit
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
What we do on the day
- Flashing kit matched to tiles, slates or a recessed fit
- Underlay collar or membrane dressed and taped around the frame
- Rafters trimmed where the window is wider than the gap between them
- Scaffold or not — We look at the roof height and the window position to see whether scaffolding is needed.
- Energy limit for roof windows — We check the window's published figures against the energy limit for existing homes.
From arrival to clean-up
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a pitched roof window level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one day.
Do you need permission in Chester?
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Help us quote accurately
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around CH1 and we will come back with a quote or a survey date.
Common questions in Chester
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
How long does fitting take?
Fitting a pitched roof window into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.