Guide prices in St Ives
Standard window
Centre-pivot roof window with flashing kit, tiles cut and refitted, inner lining
Larger or top-hung
Bigger or top-hung windows, or two in the same roof
Electric or pair
Electric or solar windows, or a matched pair with blinds
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering PE27 and neighbouring districts
Jobs across PE27, PE29 and CB24 are part of our normal cover for St Ives. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Huntingdon and St Neots are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.
Already bought your unit?
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a pitched roof window, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the opening size and the flashing kit it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
What we do on the day
- Rafters trimmed where the window is wider than the gap between them
- Insulation collar and vapour layer fitted to stop a cold edge
- Underlay collar or membrane dressed and taped around the frame
- Head height and view — We think about how the window will be used from inside before fixing its height.
- Flashing to suit the roof — We match the flashing kit to your roof covering before ordering.
What happens on the day
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a pitched roof window level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one day.
Planning and building rules in England
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Help us quote accurately
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around PE27 and we will come back with a quote or a survey date.
Common questions in St Ives
Will my new pitched roof window leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
How long does fitting take?
Fitting a pitched roof window into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Tell us your postcode, PE27 or close by, and what you want fitted. We will reply with the next steps and a quote.

