Guide prices
About 1 × 2 m
Aluminium lantern, double glazed, fitted and glazed on a ready upstand
About 1.5 × 3 m
Mid-size lantern, solar-control glass options
2 × 4 m and over
Large lanterns, lifting gear on the day
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering LS18 and neighbouring districts
Looking at a property near Horsforth but not quite in it? We work across LS18, LS16 and LS19 and outwards to Yeadon, Pudsey and Guiseley. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Horsforth.
Fit-only or supply and fit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a roof lantern, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
Included in the work
- Glass lifted and laid into the frame by hand or with gear
- Roof membrane checked where it meets the lantern frame
- Internal trims fitted to the ring beam or upstand
- Following the build order — We assemble lanterns in exactly the sequence the instructions give.
- Lanterns and planning — We check whether your lantern can go in without a planning application.
Fitting your roof lantern, step by step
Morning first: the team arrives, introduces itself and walks through the job with you. Dust sheets go down in the room below and along the route in. Then the opening and upstand, or the flashing on a pitched roof, are checked against the unit's measurements. A roof lantern goes in, is fixed to the maker's pattern and sealed into the roof covering. Inside, the reveal is finished as quoted. Before leaving, the team clears debris and talks you through what was done. Most jobs of this type take one to two days.
Planning, building control and Horsforth
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Getting a price from photos
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, LS18 or nearby, confirms travel.
Common questions in Horsforth
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Do you cover Horsforth?
Yes. Fitters travel to addresses in Horsforth and the surrounding districts, including LS18. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Send a few photos and your LS18 postcode, and we will put together a written quote for the job.