Gateshead guide prices
About 1 × 2 m
Aluminium lantern, double glazed, fitted and glazed on a ready upstand
About 1.5 × 3 m
Mid-size lantern, solar-control glass options
2 × 4 m and over
Large lanterns, lifting gear on the day
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Gateshead
Our fitters come to you. For Gateshead that covers NE8, NE99 and NE1, plus nearby Newcastle upon Tyne and Felling. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
Buying your own, or letting us supply
Your unit or ours, the fitting standard is the same. For supply and fit we choose a roof lantern to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
What we do on the day
- Upstand checked for size, level and square before the kit is opened
- Glass cleaned and packaging cleared from the roof
- Glass lifted and laid into the frame by hand or with gear
- Following the build order — We assemble lanterns in exactly the sequence the instructions give.
- Lanterns and planning — We check whether your lantern can go in without a planning application.
A typical installation day
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a roof lantern: one to two days, weather permitting.
Regulations for Gateshead properties
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Getting a price from photos
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around NE8. That is enough for a first price.
Common questions in Gateshead
Do you cover Gateshead?
Yes. Fitters travel to addresses in Gateshead and the surrounding districts, including NE8. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
What upstand height and roof pitch does roof lantern fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Tell us your postcode, NE8 or close by, and what you want fitted. We will reply with the next steps and a quote.