Guide prices
About 1 × 2 m
Aluminium lantern, double glazed, fitted and glazed on a ready upstand
About 1.5 × 3 m
Mid-size lantern, solar-control glass options
2 × 4 m and over
Large lanterns, lifting gear on the day
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Where our fitters travel
Our fitters come to you. For Barrhead that covers G78, PA2 and G77, plus nearby Paisley and Newton Mearns. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
Buying your own, or letting us supply
If you have bought a roof lantern yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.
What the job includes
- Glass cleaned and packaging cleared from the roof
- Upstand checked for size, level and square before the kit is opened
- Caps, end closures and ridge trims fitted and sealed
- Level, not to a fall — We set or check the kerb level unless your lantern's maker says otherwise.
- Following the build order — We assemble lanterns in exactly the sequence the instructions give.
A typical installation day
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a roof lantern level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one to two days.
Planning and building rules in Scotland
In Scotland, forming a new rooflight opening needs a building warrant from the council, because the roof is being altered. Replacing an existing rooflight complete with its frame doesn't need a warrant, but the new unit still has to meet the building standards, including the 1.6 W/m²K energy figure for windows and rooflights in alterations. Planning depends on the house and where it is: householder permitted development rights don't apply in conservation areas, and listed buildings need consent. We confirm this with you before quoting.
Before you get in touch
Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in G78, and we can price it.
Common questions in Barrhead
Will my new roof lantern leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Tell us your postcode, G78 or close by, and what you want fitted. We will reply with the next steps and a quote.