Our guide price for roof lantern installation starts from £3,095, and the real figure for your roof in Bow depends on a handful of things: the size and type of roof lantern, whether the opening exists already, the roof covering, and how easy access is. We fix the price in a written quote before work begins. Nothing gets added on the day without your say-so. For a rough idea first, photos and a couple of measurements are enough to go on, and we cover all of Greater London.

Guide price from £3,095 · Supply & fit

What the job costs in Bow

About 1 × 2 m

£3,095 – £4,545including VAT at 20%

Aluminium lantern, double glazed, fitted and glazed on a ready upstand

About 1.5 × 3 m

£4,545 – £7,195including VAT at 20%

Mid-size lantern, solar-control glass options

2 × 4 m and over

£7,195 – £11,395including VAT at 20%

Large lanterns, lifting gear on the day

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Fitters travel to the job, so the address is what counts. In Bow that means postcode districts E3, E15 and E14, and the same teams can just as easily take on work in Stratford, about 1 mile away, or Limehouse at roughly 1 mile. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

Buying your own, or letting us supply

If you have bought a roof lantern yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.

Included in the work

  • Upstand checked for size, level and square before the kit is opened
  • Glass lifted and laid into the frame by hand or with gear
  • Frame assembled on the kerb in the maker's set order
  • Following the build order — We assemble lanterns in exactly the sequence the instructions give.
  • Level, not to a fall — We set or check the kerb level unless your lantern's maker says otherwise.

How a fitting day runs

Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a roof lantern: one to two days, weather permitting.

Do you need permission in Bow?

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Getting a price from photos

A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, E3 or a neighbouring district.

Common questions in Bow

How long does fitting take?

Fitting a roof lantern into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Will my new roof lantern leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

Tell us your postcode, E3 or close by, and what you want fitted. We will reply with the next steps and a quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Roof lanterns in Bow

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote