Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Salisbury · SP1 · Wiltshire

New rooflight in an existing roof in Salisbury

Rooflight work is weather work. Membranes, primers and sealants all want a dry surface, so a fitting day in Salisbury is planned around the forecast rather than pinned to a date regardless of rain. The opening is kept covered whenever it is exposed, and a roof is not left open overnight without a proper temporary seal. That approach applies to every rooflight we install, from a new opening to a straight swap or a fit-only job. We cover Salisbury, the SP1 district and the rest of Wiltshire.

Guide price from £2,295 · Supply & fit, including structure and making good; building control or warrant fees extra

Salisbury guide prices

Small fixed unit

£2,295 – £3,345including VAT at 20%

Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration

Medium fixed unit

£3,345 – £4,795including VAT at 20%

As the small unit, with a larger opening up to about 1 × 2 m and additional trimming

Large or opening unit

£4,795 – £7,795including VAT at 20%

Bigger structural work or an electric opening unit

Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Coverage in and around Salisbury

Our fitters come to you. For Salisbury that covers SP1, SP2 and SP5, plus nearby Romsey and Andover. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.

Fit-only or supply and fit

Your unit or ours, the fitting standard is the same. For supply and fit we choose a new rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.

On the day, we cover

  • Survey of joist direction, roof build-up, ceiling void and access
  • Plasterboard reveals formed inside and left ready for skim or decoration
  • Roof membrane, felt or tiles made good and dressed up the upstand
  • Which way the joists run — We check the direction and size of the joists before fixing the rooflight's position.
  • Warm or cold roof build-up — We find out whether the roof is insulated above or between the joists before designing the upstand.

From arrival to clean-up

On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a new rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.

Regulations for Salisbury properties

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Before you get in touch

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around SP1 and we will come back with a quote or a survey date.

Common questions in Salisbury

What upstand height and roof pitch does rooflight fitting need?

It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

Can you fit a rooflight in winter or when it is raining?

Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

For a free, no-obligation quote in Salisbury, use the form or call us with the details of your roof.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

New openings in Salisbury

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote