Guide prices in Yeadon
Small fixed unit
Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration
Medium fixed unit
As the small unit, with a larger opening up to about 1 × 2 m and additional trimming
Large or opening unit
Bigger structural work or an electric opening unit
Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Yeadon we cover
Fitters travel to the job, so the address is what counts. In Yeadon that means postcode districts LS19, LS20 and LS18, and the same teams can just as easily take on work in Guiseley, about 1 mile away, or Horsforth at roughly 3 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
Buying your own, or letting us supply
Supply and fit tends to suit people who would rather not pick a unit from a catalogue. We look at the roof, the opening and how you use the room, then put a new rooflight on the quote that fits all three. Fit-only suits people who already know what they want, or have one on site. We are happy with either. The difference is who stands behind what: on fit-only, the maker or retailer covers the product, and our workmanship guarantee covers the installation.
What we do on the day
- Insulated upstand built square, level and to the maker's height
- Plasterboard reveals formed inside and left ready for skim or decoration
- Roof membrane, felt or tiles made good and dressed up the upstand
- Upstand energy performance — We build the upstand to meet the energy limit for site-built upstands, not just to hold the rooflight up.
- Warm or cold roof build-up — We find out whether the roof is insulated above or between the joists before designing the upstand.
A typical installation day
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a new rooflight: two to three days, weather permitting.
Do you need permission in Yeadon?
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Getting a price from photos
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around LS19. That is enough for a first price.
Common questions in Yeadon
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
Do you cover Yeadon?
Yes. Fitters travel to addresses in Yeadon and the surrounding districts, including LS19. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
Get in touch with the details of your Yeadon property and we will explain what the job involves and what it costs.