Guide prices in Irlam
Small fixed unit
Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration
Medium fixed unit
As the small unit, with a larger opening up to about 1 × 2 m and additional trimming
Large or opening unit
Bigger structural work or an electric opening unit
Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering M44 and neighbouring districts
Distance is rarely the deciding factor. A roof in Urmston, 3 miles from Irlam, gets the same survey, the same written quote and the same fitting process as one in M44, M31 and M41. What changes the price is the job itself: size of unit, roof type, access and lifting. Sale, around 4 miles out, is treated the same way.
Already bought your unit?
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a new rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
On the day, we cover
- Rooflight fitted, sealed and checked for even clearance on every side
- Joists or rafters trimmed with new timbers to carry the load around
- Opening marked out, covering stripped back and the deck cut cleanly
- Warm or cold roof build-up — We find out whether the roof is insulated above or between the joists before designing the upstand.
- Which way the joists run — We check the direction and size of the joists before fixing the rooflight's position.
How a fitting day runs
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a new rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning and building rules in England
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Getting a price from photos
Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in M44, and we can price it.
Common questions in Irlam
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Do I need planning permission for a rooflight in Irlam?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Tell us your postcode, M44 or close by, and what you want fitted. We will reply with the next steps and a quote.