Guide prices in Battersea
Small fixed unit
Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration
Medium fixed unit
As the small unit, with a larger opening up to about 1 × 2 m and additional trimming
Large or opening unit
Bigger structural work or an electric opening unit
Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Battersea
If you also own a property or a business unit in Chelsea, Clapham or Pimlico, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and SW11, SW8 and SW3 sit comfortably within that pattern.
Already bought your unit?
Your unit or ours, the fitting standard is the same. For supply and fit we choose a new rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
What the job includes
- Opening marked out, covering stripped back and the deck cut cleanly
- Plasterboard reveals formed inside and left ready for skim or decoration
- Survey of joist direction, roof build-up, ceiling void and access
- Cables, pipes and ceiling fittings — We look into the ceiling void for anything in the way of the new opening.
- Upstand energy performance — We build the upstand to meet the energy limit for site-built upstands, not just to hold the rooflight up.
How a fitting day runs
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a new rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Planning and building rules in England
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Help us quote accurately
Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in SW11, and we can price it.
Common questions in Battersea
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Do I need planning permission for a rooflight in Battersea?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Get in touch with the details of your Battersea property and we will explain what the job involves and what it costs.