Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Brough · HU15 · East Riding of Yorkshire

New rooflight in an existing roof in Brough

Rooflight work is weather work. Membranes, primers and sealants all want a dry surface, so a fitting day in Brough is planned around the forecast rather than pinned to a date regardless of rain. The opening is kept covered whenever it is exposed, and a roof is not left open overnight without a proper temporary seal. That approach applies to every rooflight we install, from a new opening to a straight swap or a fit-only job. We cover Brough, the HU15 district and the rest of East Riding of Yorkshire.

Guide price from £2,295 · Supply & fit, including structure and making good; building control or warrant fees extra

Guide prices

Small fixed unit

£2,295 – £3,345including VAT at 20%

Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration

Medium fixed unit

£3,345 – £4,795including VAT at 20%

As the small unit, with a larger opening up to about 1 × 2 m and additional trimming

Large or opening unit

£4,795 – £7,795including VAT at 20%

Bigger structural work or an electric opening unit

Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering HU15 and neighbouring districts

Fitters travel to the job, so the address is what counts. In Brough that means postcode districts HU15, HU14 and HU20, and the same teams can just as easily take on work in Hull, about 10 miles away, or Beverley at roughly 10 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

What we check on a supplied unit

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a new rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

Included in the work

  • Survey of joist direction, roof build-up, ceiling void and access
  • Plasterboard reveals formed inside and left ready for skim or decoration
  • Insulated upstand built square, level and to the maker's height
  • Which way the joists run — We check the direction and size of the joists before fixing the rooflight's position.
  • Cables, pipes and ceiling fittings — We look into the ceiling void for anything in the way of the new opening.

From arrival to clean-up

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a new rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes two to three days.

Do you need permission in Brough?

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

What to send for a quick quote

A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, HU15 or a neighbouring district.

Common questions in Brough

Will my new rooflight leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Do you need scaffolding to fit a rooflight?

Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

Ask for a quote for your Brough roof. Survey dates are offered based on fitter availability once you are happy with the price.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

New openings in Brough

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote