Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Yarm · TS15 · County Durham

New rooflight in an existing roof in Yarm

Glass is heavy, and bigger units get heavy fast. Fitting a new rooflight in Yarm means planning how it travels from the delivery vehicle to the roof without chipping an edge or straining a back. Smaller units go up by hand with two fitters. Larger ones may need a hoist, a scaffold loading bay or a crane, and we tell you at quote stage if that applies. Once it is up, the fitting follows the maker's sequence: seat, fix, seal, finish. We take on work like this across County Durham.

Guide price from £2,295 · Supply & fit, including structure and making good; building control or warrant fees extra

Yarm guide prices

Small fixed unit

£2,295 – £3,345including VAT at 20%

Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration

Medium fixed unit

£3,345 – £4,795including VAT at 20%

As the small unit, with a larger opening up to about 1 × 2 m and additional trimming

Large or opening unit

£4,795 – £7,795including VAT at 20%

Bigger structural work or an electric opening unit

Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Covering Yarm means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in TS15, TS16 and TS17, and are happy to quote further out in Thornaby-on-Tees and Stockton-on-Tees. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.

What we check on a supplied unit

If you have bought a new rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.

What the job includes

  • Roof membrane, felt or tiles made good and dressed up the upstand
  • Insulated upstand built square, level and to the maker's height
  • Opening marked out, covering stripped back and the deck cut cleanly
  • Upstand energy performance — We build the upstand to meet the energy limit for site-built upstands, not just to hold the rooflight up.
  • Planning for your roof — We check whether the new rooflight falls within permitted development for your house and nation.

How a fitting day runs

Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a new rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.

Planning and building rules in England

England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.

Getting a price from photos

For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as TS15.

Common questions in Yarm

Do I need planning permission for a rooflight in Yarm?

Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Ask for a quote for your Yarm roof. Survey dates are offered based on fitter availability once you are happy with the price.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

New openings in Yarm

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote