Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Lower Earley · RG6 · Berkshire

New rooflight in an existing roof in Lower Earley

Already bought a new rooflight, or still deciding which one to get? Both are fine. For new rooflight openings in Lower Earley we either source a suitable unit and install it, or fit the one waiting in your garage. Fit-only jobs are usually priced from your photos and measurements, while supply-and-fit and replacement jobs get a free survey first. Whichever route you take, the opening, the upstand or flashing, and the delivery are checked before anything is fixed down. Properties in RG6 and the surrounding districts are covered on the same terms.

Guide price from £2,295 · Supply & fit, including structure and making good; building control or warrant fees extra

Guide prices

Small fixed unit

£2,295 – £3,345including VAT at 20%

Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration

Medium fixed unit

£3,345 – £4,795including VAT at 20%

As the small unit, with a larger opening up to about 1 × 2 m and additional trimming

Large or opening unit

£4,795 – £7,795including VAT at 20%

Bigger structural work or an electric opening unit

Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Fitters travel to the job, so the address is what counts. In Lower Earley that means postcode districts RG6, RG2 and RG5, and the same teams can just as easily take on work in Reading, about 3 miles away, or Wokingham at roughly 4 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

Fit-only or supply and fit

If you have bought a new rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.

What the job includes

  • Survey of joist direction, roof build-up, ceiling void and access
  • Opening marked out, covering stripped back and the deck cut cleanly
  • Joists or rafters trimmed with new timbers to carry the load around
  • Which way the joists run — We check the direction and size of the joists before fixing the rooflight's position.
  • Cables, pipes and ceiling fittings — We look into the ceiling void for anything in the way of the new opening.

How a fitting day runs

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a new rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes two to three days.

Do you need permission in Lower Earley?

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

What to send for a quick quote

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, RG6 or nearby, confirms travel.

Common questions in Lower Earley

Do I need planning permission for a rooflight in Lower Earley?

Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

Will my new rooflight leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

What if my roof opening is the wrong size for the rooflight?

We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

Got a unit waiting to go in, or need one sourced? Either way, start with your Lower Earley address and a couple of photos.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

New openings in Lower Earley

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote