Guide prices in Perth & Kinross
Small fixed
Double-glazed fixed unit up to 1000 × 1000 mm, fitted to a ready upstand
Medium fixed
1000 × 1500 to 1000 × 2000 mm, double or triple glazed
Large fixed
Bigger units, solar-control glass, two-person lift or lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Towns we list in Perth & Kinross
Builders and roofers working in Perth & Kinross can use us for the rooflight element of a job, wherever the site is in Scotland. Homeowners can book us directly. In both cases the fitters come to the address, the work follows the maker's instructions, and a written quote fixes the price first. Fitting is carried out by vetted teams under S&K's direction.
What the job includes
- Reveal lined and trimmed inside, with the glass left clean
- Product paperwork handed over and warranty registration explained
- Fall confirmed so rain runs off the glass rather than sitting on it
- Solar gain on south-facing roofs — We ask which way the roof faces and how the room is used before suggesting glass.
- Ceiling and reveal depth — We measure the depth from the kerb top to the ceiling to plan the reveal.
Rules that apply in Scotland
In Scotland a new rooflight needs a building warrant before work starts. A like-for-like replacement including the frame is exempt from a warrant but must meet current standards, so the glazing has to reach 1.6 W/m²K or better. For planning, rooflights on houses outside conservation areas can often go ahead under permitted development, but it is worth confirming with the planning authority.
Common questions in Perth & Kinross
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
How long does fitting take?
Fitting a flat rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Do I need planning permission for a rooflight in Perth & Kinross?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in Scotland. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

