Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Leatherhead · KT22 · Surrey

Fit-only rooflight installation in Leatherhead

Plenty of rooflight trouble starts with a tape measure. Units are often sold by the builder's opening, meaning the hole in the roof, rather than the overall external size, and confusing the two leaves you with a frame that does not suit the opening. Before we fit any rooflight in Leatherhead, we measure the opening, the upstand or kerb where there is one, and the finished roof level, then compare them with the maker's drawing. If something is out, you hear about it before the fitting day rather than on it. That single check keeps most jobs like this on track.

Guide price from £445 · Labour only — you supply the rooflight

What the job costs in Leatherhead

Onto a ready upstand

£445 – £795including VAT at 20%

Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed

With a new upstand

£795 – £1,295including VAT at 20%

Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed

Large or heavy unit

£1,195 – £2,145including VAT at 20%

Extra hands or lifting gear, larger openings, fixed or opening units

Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Fitters travel to the job, so the address is what counts. In Leatherhead that means postcode districts KT22, KT21 and KT23, and the same teams can just as easily take on work in Epsom, about 4 miles away, or Cobham at roughly 4 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

What we check on a supplied unit

If you have bought a rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.

What the job includes

  • Internal reveal trimmed or lined, with the protective film removed at the end
  • Opening and upstand measured against the maker's drawing, timber to timber
  • Roof membrane dressed up the kerb and finished under the drip edge
  • Warranty conditions on your unit — We read the warranty terms that came with your rooflight before we fit it.
  • Upstand height above the roof — We measure how far the upstand stands above the finished roof surface, including any ballast or walkway.

What happens on the day

Where a job takes half a day to a day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.

Planning and building rules in England

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

Details that speed up your quote

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around KT22 and we will come back with a quote or a survey date.

Common questions in Leatherhead

Do you need scaffolding to fit a rooflight?

Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

What if my roof opening is the wrong size for the rooflight?

We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

Ask for a quote for your Leatherhead roof. Survey dates are offered based on fitter availability once you are happy with the price.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Fit-only fitting in Leatherhead

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote