Birkenhead guide prices
Onto a ready upstand
Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed
With a new upstand
Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed
Large or heavy unit
Extra hands or lifting gear, larger openings, fixed or opening units
Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Birkenhead and the districts around it, CH41, CH42 and L2, all sit inside our working area. So does the ground between Birkenhead and Liverpool (2 miles), and on towards Kensington (3 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
What we check on a supplied unit
If you have bought a rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.
What we do on the day
- Unit bedded on the sealant or tape the maker specifies, then screw-fixed
- Upstand height, level and fall checked, and squareness confirmed across the diagonals
- Roof membrane dressed up the kerb and finished under the drip edge
- Delivery damage and missing parts — We ask you to open the delivery and check it as soon as it arrives, not on fitting day.
- Internal versus external size — We check whether your rooflight's quoted size is the hole size or the outer frame size.
How a fitting day runs
Where a job takes half a day to a day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Do you need permission in Birkenhead?
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Getting a price from photos
For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as CH41.
Common questions in Birkenhead
How long does fitting take?
Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Got a unit waiting to go in, or need one sourced? Either way, start with your Birkenhead address and a couple of photos.