Andover guide prices
Onto a ready upstand
Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed
With a new upstand
Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed
Large or heavy unit
Extra hands or lifting gear, larger openings, fixed or opening units
Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering SP10 and neighbouring districts
Looking at a property near Andover but not quite in it? We work across SP10, SP11 and SO20 and outwards to Winchester, Newbury and Romsey. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Andover.
What we check on a supplied unit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
Included in the work
- Roof membrane dressed up the kerb and finished under the drip edge
- Unit bedded on the sealant or tape the maker specifies, then screw-fixed
- Upstand height, level and fall checked, and squareness confirmed across the diagonals
- Upstand height above the roof — We measure how far the upstand stands above the finished roof surface, including any ballast or walkway.
- Internal versus external size — We check whether your rooflight's quoted size is the hole size or the outer frame size.
A typical installation day
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Regulations for Andover properties
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Getting a price from photos
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around SP10 and we will come back with a quote or a survey date.
Common questions in Andover
Can you fit the rooflight I bought online?
Yes, fit-only is one of our core services. Send the product link or spec, photos of the roof and rough sizes, and we can usually price it from those. Before fitting we check the delivery for damage, which should be reported to the seller, plus the size against the builder's opening and the upstand height. The product warranty stays with the maker or seller, and our guarantee covers the fitting.
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
How long does fitting take?
Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Send a few photos and your SP10 postcode, and we will put together a written quote for the job.