Guide prices
Onto a ready upstand
Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed
With a new upstand
Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed
Large or heavy unit
Extra hands or lifting gear, larger openings, fixed or opening units
Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Heston we cover
Distance is rarely the deciding factor. A roof in Hounslow, 1 mile from Heston, gets the same survey, the same written quote and the same fitting process as one in TW5, UB2 and TW4. What changes the price is the job itself: size of unit, roof type, access and lifting. Isleworth, around 2 miles out, is treated the same way.
Buying your own, or letting us supply
Supply and fit tends to suit people who would rather not pick a unit from a catalogue. We look at the roof, the opening and how you use the room, then put a rooflight on the quote that fits all three. Fit-only suits people who already know what they want, or have one on site. We are happy with either. The difference is who stands behind what: on fit-only, the maker or retailer covers the product, and our workmanship guarantee covers the installation.
Included in the work
- Unit bedded on the sealant or tape the maker specifies, then screw-fixed
- Opening and upstand measured against the maker's drawing, timber to timber
- Opening tested where relevant, packaging taken away and paperwork handed back
- Upstand height above the roof — We measure how far the upstand stands above the finished roof surface, including any ballast or walkway.
- Delivery damage and missing parts — We ask you to open the delivery and check it as soon as it arrives, not on fitting day.
How a fitting day runs
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes half a day to a day.
Planning, building control and Heston
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Help us quote accurately
For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as TW5.
Common questions in Heston
How long does fitting take?
Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Get in touch with the details of your Heston property and we will explain what the job involves and what it costs.